Motion and Time Study Analysis of the A.C. Assembly Line at EGAT Company/GP/Dr.Nahed Sobhi.
Ramy H. El Banna
Motion and Time Study Analysis of the A.C. Assembly Line at EGAT Company/GP/Dr.Nahed Sobhi. - Giza MSA, [2003] - 67 P
Engineering--Study Analysis--EGAT Company--Industrial Engineering
620.5
Motion and Time Study Analysis of the A.C. Assembly Line at EGAT Company/GP/Dr.Nahed Sobhi. - Giza MSA, [2003] - 67 P
Engineering--Study Analysis--EGAT Company--Industrial Engineering
620.5