Improve Productivity in Cable Factory // GP // Prof.Dr. Nahed Sobhi // Dr. Sameh Salah ( 2018 - 2019 ) (Record no. 25143)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 01467nam a22002177a 4500 |
003 - CONTROL NUMBER IDENTIFIER | |
control field | OSt |
005 - DATE AND TIME OF LATEST TRANSACTION | |
control field | 20190912122749.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 190912b ||||| |||| 00| 0 eng d |
040 ## - CATALOGING SOURCE | |
Transcribing agency | MSA |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Ismail Jehad Foudeh 137621 |
245 ## - TITLE STATEMENT | |
Title | Improve Productivity in Cable Factory // GP // Prof.Dr. Nahed Sobhi // Dr. Sameh Salah ( 2018 - 2019 ) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
Place of publication, distribution, etc. | Giza : |
Name of publisher, distributor, etc. | MSA, |
Date of publication, distribution, etc. | 2019. |
300 ## - PHYSICAL DESCRIPTION | |
Extent | 71 p. |
500 ## - GENERAL NOTE | |
General note | Faculty of Engineering - Department of Industrial |
520 ## - SUMMARY, ETC. | |
Summary, etc. | The objective of this project is to increase the productivity of the electrical cable factory to satisfying all customer orders. This project aims to implementing lean tools to monitoring all processes in the production line. This project focus on uses Pareto chart to find the priority of the specific product problem, also uses value stream mapping to monitor the production line and identify the location of bottleneck, use the line balancing to improve the productivity .In this project also use the theory of constrains to find the optimum speed of sheathing machine to increase its productivity. This project implement single minute exchange of die methodology to decrease set up time of insulation machine. |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Industrial System Engineering |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Improve Cable Productivity |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Nour El-Din El-Sayed Abdel-Latif 136115 |
856 ## - ELECTRONIC LOCATION AND ACCESS | |
Uniform Resource Identifier | <a href="https://drive.google.com/drive/u/1/folders/1jo4tYJMoY4T-WLcfSNqDg4RsISwc7-J5">https://drive.google.com/drive/u/1/folders/1jo4tYJMoY4T-WLcfSNqDg4RsISwc7-J5</a> |
Public note | Full Text Here |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Source of classification or shelving scheme | Dewey Decimal Classification |
Koha item type | Gradution Project |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Home library | Current library | Shelving location | Date acquired | Total Checkouts | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Centeral Library | Centeral Library | Soft Copy located on library Cataloge | 12.09.2019 | GP177ENG2019Industrial Engineering | 82144 | 12.09.2019 | 12.09.2019 | Gradution Project |