35986841_10216840653711318_1105697261150535680_n
Normal view MARC view ISBD view

Improving Productivity Through Waste Elimination in A Harnesses Assembly Line // GP // Dr. Nahed Sobhi // Dr. Sameh Salah (2018)

By: Fathi Abdelmenem Mohamed 140529.
Contributor(s): Youssef Mohamed Mohamed 141295.
Material type: materialTypeLabelBookPublisher: Giza MSA 2018Description: 77 P. 30 CM.Subject(s): Engineering -- Industerial -- Productivity -- ImprovingDDC classification: 621
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode
Gradution Project Gradution Project Second Floor - Engineering & Architecture GP178ENG2018Industrial (Browse shelf) Available 81983
Compact Disk Compact Disk Second Floor - Engineering & Architecture GP334 (Browse shelf) Available 900051916

GP178ENG2018Industrial

There are no comments for this item.

Log in to your account to post a comment.

Click on an image to view it in the image viewer