Item type | Current library | Call number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|
Gradution Project | Centeral Library Second Floor - Engineering & Architecture | GP 6 ENG 2009 Computer Systems (Browse shelf(Opens below)) | Available | 82342 |
Browsing Centeral Library shelves, Shelving location: Second Floor - Engineering & Architecture Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
GP5ENG2004Communications&Electronics RE Frequency Transmitter/GP/Dr.Mahmoud Alam | GP5ENG2004Industrial Computerized Preventive Maintenanci Planning for Fire Tube Boilers/GP/Dr.Attia H.Gomma | GP5MGT2011 Entertainment Center / GP / Dr. Hazim Yassien | GP 6 ENG 2009 Computer Systems Remote Administration On House Using Wireless Communication \ Dr. Moataz Salah \ | GP 60 ENG 2014 Comm. & Electronics QUAD CO - ORDINATE Customizable wall Mounted CNC // GP // Dr. Sameh Noman | GP 60 ENG 2014 Comm. & Electronics QUAD CO - ORDINATE Customizable wall Mounted CNC // GP // Dr. Sameh Noman | GP 60 ENG 2020 ARCH PHYSICAL REHABILITATION In safaga Center // GP // DR // Sameh EL-Feky |
There are no comments on this title.
Log in to your account to post a comment.