Item type | Current library | Call number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|
Gradution Project | Centeral Library Second Floor - Engineering & Architecture | GP21 ENG 2019 ARCH (Browse shelf(Opens below)) | Available | 82500 |
Browsing Centeral Library shelves, Shelving location: Second Floor - Engineering & Architecture Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
GP 20 ENG 2021 ARCH Mansoura Intermodal Transportation Hub / | GP20ENG2007Industrial Coffee grinding machine improvement/GP/Dr. Mohamed Abd El-Ghany Fayed | GP20ENG2009Communications&Electronics Control light system/GP/Dr. Mohamed Hanafi | GP21 ENG 2019 ARCH Rosetta Heritage Complex \ | GP21 ENG2009 Communications&Electronics Design and implementation of ultra wide band planer antennas/GP/Dr. Deena A. Salem | GP21ENG2008Industrial Engineering Design and Manufacture of Gymnastic Irrigation System/GP/Dr.Said Ashour/Dr.Mohamed Abd El Ghany Fayed. | GP22 ENG 2021 ARCH Educational Centre For Boat Manufacturing \ |
There are no comments on this title.
Log in to your account to post a comment.