Fathi Abdelmenem Mohamed 140529

Improving Productivity Through Waste Elimination in A Harnesses Assembly Line // GP // Dr. Nahed Sobhi // Dr. Sameh Salah (2018) - Giza MSA 2018 - 77 P. 30 CM.

GP178ENG2018Industrial


Engineering--Productivity--Improving--Industerial

621